Skip to content

Mismatch in calendar when using a temporal perturbation on the "experiment" calendar. #69

Description

@mpudig

I am experiencing a slow-down in my ACCESS-OM2-1 simulations when applying a time-dependent, spatially constant perturbation.

However, the slow-down appears only to arise when I start from a spun-up control simulation. When I start from a cold start, my simulation runs fine (finishing 1 year in ~14 minutes wall time). Whereas when I start from a spun-up control simulation (starting at model year 2100) my simulation runs fine until it experiences a dramatic slow-down at around 2100-11-10 (finishing 1 year in ~1 hr wall time).

The cold-start run can be found at /home/561/mp2135/access-om2/1deg_jra55_ryf_wcwc_test1 and the run experiencing the slow-down can be found at /home/561/mp2135/access-om2/1deg_jra55_ryf_wcwc_test2. The only difference between the two is that test2 is branched from a spin-up.

There has been some previous discussion in this thread on Slack https://arccss.slack.com/archives/C08KM5KS6/p1625456199042400.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions